All rights are reserved. The material contained herein is the copyright property of Embry-Riddle Aeronautical University, Daytona Beach, Florida, 32114. No part of this material may be reproduced, stored in a retrieval system or transmitted in any form, electronic, mechanical, photocopying, recording or otherwise without the prior written consent of the University.
College of Business | worldwide.erau.edu
Principles of Supply Chain Management LGMT 444
Problem Set 6
1. With an average service rate of 15 customers per hour and an average customer arrival rate of 12 customers per hour, calculate the probability that actual service time will be less than or equal to five minutes.
2. Analyze the operating characteristics of a single-channel single-phase queuing system that can handle 10 customers per hour with customer arrival rate of six per hour. In addition, calculate the probability that there are more than three customers in the system.
3. NIA Motor is an e-scooter manufacturer that employs ten people at $15 per hour. Assume you were tasked to track productivity performance measures using the data shown in the following table:
Financial Information |
2018 Results |
Net sales |
$400,000 |
Current assets |
$108,000 |
Net income after taxes |
$88,200 |
Current liabilities |
$44,000 |
Cost of goods sold (purchased items) |
$50,000 |
Avg. inventory value |
$16,000 |
Inputs and Outputs |
|
Scooters produced |
4,000 |
Labor hours |
9,600 |
Lease payments |
$40,000 |
a. Calculate the labor productivity, lease productivity, and material productivity.
b. Calculate the multiple-factor productivity. If the multiple factor productivity for 2017 was 0.008 scooter/dollar, then what was the productivity growth from 2017 to 2018?